FARRINGTON HIGHWAY WIDENING

Ulehawa Stream to Piliokoe Gulch

(Nanakuli Bridge to Piliokoe Gulch)

Project No. B-900-01-64, Unit 1

Archive – 0093-019

 

INDEX TO DRAWINGS

SHEET NO.

DESCRIPTION

1

TITLE SHEET

2 – 3

TYPICAL ROADWAY SECTIONS

4 – 8

PLAN & PROFILE

9 – 10

PAVEMENT GRADE DETAILS

11

TRANSITION DETAILS

12

INTERSECTION DETAILS

13 – 14

DRIVEWAY DETAILS

15 – 20

ORDER OF WORK AND DETOURS

21 – 22

ROADWAY SIGNS AND LANDSCAPING

23 – 33

STANDARD ROADWAY SIGNS & GUARDRAILS

34 – 38

RETAINING WALL DETAILS

39 – 43

CULVERT DETAILS

44

TYPICAL CUTOFF DITCH

45

TYPE B SHOULDER DROP INTAKE

46 – 47

STANDARD DRAINAGE DETAILS

48 – 54

PILI-O-KOE BRIDGE

55 – 60

MISCELLANEOUS STANDARD DETAILS

61 – 63

RIGHT-OF-WAY

64 – 72

CROSS SECTIONS

73 – 74

UTILITIES

75 – 76

UTILITY DETAILS